Speakers will be placed on ceiling
Side wall where the TV, and wall speakers for the home theater will go
Walls & wires
Mini storage area under the stairs to go into the basement
Box, with the wiring
Wider view
Top
Bathroom inside the door
Pipes in bathroom
Laundry area/pipes as well
Aluminum tape on ducts
Aluminum tape again
Hospital grade paste for covering
Wall beside mini-storage area
Wiring to the bathroom
Some more studs, inside is the furnace
Wiring
Studs/wiring
Placed dry-wall
Another view of dry-wall
Bathroom, where the bathroom dry-wall will go
Bathroom area dry-wall completed
Bathroom again, green dry-wall (thicker/moisture resistant)
Laundry area, same green dry-wall
Laundry area/soon to be closet
Some more dry-wall
Again
Again some moe
Mini-storage area
More views
Another view
Taping being done
Bathroom with taping
Taping again
After paint, laundry area
Putting on tiles for the bathroom
Tiles again
Painted, tile carpet not placed yet
Area now, furnished, speakers, pot lights, etc..
TV, speakers, will fix the receiver (add table, make it look nice).
Another view
Office area (where the box was is now covered by door)
Bathroom french door
Full bathroom, with glass shower
Closer view of shower
Laundry room area, with custom sink/counter-top/cabinets
Closer view of sink
Laundry area from a distance